• Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks
  • Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks
  • Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks
  • Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks
  • Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks
  • Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks
  • Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks

Clash Free BIM Modeling for Residential-Inn of California Using Revit & Navisworks

Categories:
Air Conditioning, Cladding, Exterior Finish, Fabrics, Flooring & Accessories, Indoor Furniture, Interior & Exterior, Interior Finish, Other Appliances, Other Plumbing, Stairs, Elevators & Escalators, Wall & Ceiling Lights
Date Updated:
October 19, 2018

The Objective

To create information rich, intelligent BIM with architectural, structural and MEP details for a 6 storied building in California.

Technology/Software Used

Revit, Navisworks

Challenges

1: Missing structural drafts and specifications in the input files from client end.
2: Side cutting fields at the basement were problematic, where the dimensions and survey points did not match

Engineering Solution

1: Information rich, intelligent BIM with LOD 300 for effective material take offs, project coordination, and scheduling was prepared.
2: Inputs received as .PDF files, were successfully converted to BIM to meet architectural and MEP disciplines.
3: Generated missing inputs for structural disciplinethrough engineering assumptions, which were 90% accurate - as confirmed upon receipt of original files at a later stage.
4: Required iterations were done in the 3D Revit model.
5: Analyzed the model for coordination and clash detection for clash mitigation.

Benefits

1: Even after the delays in receiving structural details and input files from the client, the project was successfully executed within the set time frame of 6 weeks.
2: Clash detection helped clients detect and mitigate clashes at an early stage, and save the massive costs of mitigating these clashes at the time of actual construction.
3: The material takes offs, and project scheduling estimates provided, reduced the overall time and cost of construction, and made the process seamless, coordinated and error free.

Ask a question about this product

Ask a Question

Related BIM Objects

Armchair Luis XV ...

SAVE VIEW

Project Objective Create clash free Architectural, Str...

SAVE VIEW

Project Objective: Intelligent MEP BIM Modeling w...

SAVE VIEW

The Objective To develop a clash free BIM model that pro...